Wednesday, August 31, 2011

The Storm has Passed...

Irene has come and gone, thankfully. We are still getting earthquake aftershocks, (19 since last Tuesday) but I haven’t felt them, which is a good thing. My heart goes out to those who lost loved ones.  That is the hardest thing to deal with in all of this turmoil.  But, life has pretty much returned to normal if there is such a thing.

I know in some previous post, I said that I would not be doing another challenge for a while if ever again. I find them stressful and the pace somewhat unreasonable. Some people are so prolific in their quilt making and I just find it hard to keep up. Also, I get bored easily, so the challenge may be just that, but if it does not hold my attention, it’s off to the UFO bin, which is overflowing. I do plan to complete each UFO and donate them to worthy causes; it is just taking longer than I had planned.

To compound all of this, there is just nothing new and sexy going on in the quilt world right now. Remember, when the 2-1/2 inch strips were all the rage. There were all kinds of books and patterns out. There were tons of projects just for the strips with accompanying rulers and templates. And then someone came up with Bali Pops in all of the different flavors along with the various copy cats. Then there was the strip cutter and Accuquilt Go die cutters. Just amazing stuff… But I think we are experiencing a loll right now. Well except for the automated pin dispenser. I am still trying to figure that out.

So, I have decided to do another challenge…one that I chose for myself and a few of my friends (even though they are getting cold feet). To make it more challenging, there are no rules to speak of and a very, very long time frame if we complete it by then.

This quilt has been on my mind since well…1999. I purchased the book and the software when it became available. I even attempted once to piece what I thought was one of the easier blocks. The block was never completed. I wasn’t ready. But now I am…and I am going to do it along with all of the other projects that I have going on. And to make it more challenging I am going to do another quilt simultaneously (sp?), to keep my mind and hands focused and busy. I am going to start the Dear Jane (DJ) quilt that I have wanted to make for the last 10 or more years. The other quilt that I will work on is the Farmer’s Wife Quilt sampler (FWS). No,  I am not crazy…and that is all I am going to say about that for right now. Below is a picture of the FWS blocks that I have completed, so you will know that I am serious (for right now).  The DJ blocks are taking a little longer.  Check out the website and you will understand http://www.dearjane.com/ why.   I guess I also need to mention that the DJ blocks finish at 4-1/2 inches and there are 225 blocks; the FWS blocks finish at 6-1/2 inches and there are 111 blocks.  That is the real challenge.

I am finishing up the African snowball quilt top over the long holiday weekend and then back to the ocean waves. And in between those 2 projects, I will put together a DJ or FWS block or 2.

3 comments:

Barb H said...

What an ambitious list of projects. And they all will be lovely. I've admired the DJ quilts but don't think I have the patience to make that many itsy bitsy blocks. Keep posting pix of your progress.

Latebloomerar said...

Love the color choice on the attic window.

Nic said...

I like your FWQ blocks. The taupes will make for very interesting blocks.
I'm looking forward to seeing your DJ progress. This project is also on my list, but I don't plan to start it until I've done the FWQ.